logo

logo

product
description

Products Introduction
P&I Curtain Wall
Initial rainwater treatment facility/CSOs treatment P&I Curtain Wall features all of the simplicity and economic feasibility of a screen, superb treatment efficiency of filter media, the ease of maintenance unique to a curtain wall. Also, it guarantees lasting operational capability through the automation of maintenance such as automatic draining of still water, automatic washing, etc.
Name of Construction Method
P&I Curtain Wall
Outline of Construction Method
1

1st screen → gravity sedimentation → cylindrical screen → Curtain Wall (radial multi-stage filter media)

Facility Explanation Clip
Excellence of Technology

Features the simplicity and economic feasibility of a screen, superb treatment efficiency of filter media, the ease of maintenance unique to a curtain wall.

Guarantees lasting operational capability through the automation of maintenance such as automatic draining of still water, automatic washing, etc.

Core Principle of the Construction Method
2

Principle

  • Forms a radial flow of the moving water from the center to the edge
  • At the center, where the velocity of the moving water is fast, treat the impurities by forming a screen and vortex
  • At the edge, where the velocity of the moving water gets slower as the cross section gets wider, treat the contaminants by forming fiber media via multiple stages (Curtain Wall)
Maintenance
  • Automatic Backwash System
    • After heavy rain, drains still water

      Automatic exclusion by the water pump
    • Unpowered automatic spinning backwash system

      Unpowered system possible due to time constant water pressure & nozzle angle
  • Automatic Maintenance System
    • Applies rain sensor & water level sensor

      Automatic backwashing depending on water level detection
    • Fully automatic system driven by automatic control panel

  • Convenient Facility Inspection
    • The only structure that allows descension to the bottom of the facility

    • The worker can enter the facility to maintain it

Facility Certification Status
  • 1. New construction technology

  • 2. Excellent public procurement product

  • 3. Patent/competence certification.